The Influence of Project Managers’ Hard and Soft Competencies on the Success of Fiber Optic Projects in Indonesia with Moderation of Project Managers’ Work Experience
Abstract
Fiber optic network development is a strategic priority for expanding equitable internet access and supporting socio economic growth. Despite its importance, fiber optic projects often face implementation challenges that create stakeholder conflicts and expose projects to risks that may hinder success. Because fiber optic communication systems are widely used from local to international levels, their implementation demands not only technological readiness but also capable human resources. In this context, project managers are central to project outcomes, and selecting the right manager becomes essential, although the competencies required may differ across organizations and projects.
Based on the literature, project managers’ hard competencies, soft competencies, and work experience are considered important factors related to project success. Work experience is also often viewed as a factor that can strengthen employee competencies. Accordingly, this study examines the effects of project managers’ hard and soft competencies on the success of fiber optic projects in Indonesia and tests whether work experience moderates these relationships.This study uses a quantitative survey approach and analyzes the data with Partial Least Squares. The findings show that work experience does not significantly affect the success of fiber optic projects in Indonesia and does not moderate the influence of either hard or soft competencies on project success. In contrast, hard competencies have a positive and significant effect on project success, while soft competencies show a positive but not significant effect. These results indicate that technical competence remains the most decisive factor in the success of fiber optic projects.
References
Ahsan, K., Ho, M., & Khan, S. (2013). Recruiting project managers: A comparative analysis of competencies and recruitment signals from job advertisements. Project Management Journal.
Aji, L. S. (2022). Feasibility study of fiber optic infrastructure development plan in Indonesia. Budapest International Research and Critics Institute Journal (BIRCI Journal), 5(3).
Akhwaba, J. (2021). Leadership skills, stakeholder management and execution of fibre optic infrastructure: Intervening influence of government policy. Organization, Technology and Management in Construction, 13, 2426–2437.
Akhwaba, J. K., Bowa, O., & Keiyoro, P. (2020). Leadership skills, stakeholder management and execution of fibre optic infrastructure. Journal of Engineering, Project, and Production Management, 10(1), 80–86.
Alvarenga, J. C., Branco, R. R., Guedes, A. L. A., Soares, C. A. P., & e Silva, W. D. (2019). The project manager core competencies to project success.
APJATEL. (2022). Tanpa fiber optik, nggak bakal ada 5G.
APJATEL. (2023). Eksklusif Ketum APJATEL Jerry Mangasas Swandy: Baru 30 persen wilayah Indonesia terlayani jaringan fiber optik.
Azimi, M. F. (2025). Evaluasi penjadwalan proyek pembangunan jaringan very small aperture terminal (VSAT) dengan pendekatan critical path method (CPM) di PT XYZ Jakarta.
Do Vale, J. W. S. P., Nunes, B., & de Carvalho, M. M. (2018). Project managers’ competences: What do job advertisements and the academic literature say? Project Management Journal, 49(3), 82–97.
Fareed, M. Z., Su, Q., & Awan, A. A. (2021). The effect of emotional intelligence, intellectual intelligence and transformational leadership on project success: An empirical study of public projects of Pakistan. Project Leadership and Society.
Ganancias, F. M. (2025). Bridging the serat future: Competency assessment and skills development for engineering and ICT professionals in Carcanmadcarlan. International Journal for Multidisciplinary Research (IJFMR), 7(4).
Global Alliance for Project Performance Standards. (2007). A framework for performance based competency standards for global level 1 and 2 project managers.
Gruden, N., & Stare, A. (2018). The influence of behavioral competencies on project performance. Project Management Journal, 49(3), 98–109.
Gunawan, Y. I. (2014). Pemodelan partial least square kebijakan perusahaan, kompetensi manajemen proyek dan tingkat maturity manajemen proyek terhadap kinerja proyek pada tahap konstruksi di Jakarta.
Hamsah, A. I. (2021). Kompetensi pegawai dalam pelayanan akademik dan kemahasiswaan pada Politeknik STIA LAN Makassar.
Hoxha, L. (2017). Relationship between project manager’s age, years of project experience, and project success.
Jaya, W. M., & Nurendra, A. M. (2019). Pengembangan kamus kompetensi teknis di perusahaan manufaktur mesin pertanian. Jurnal Muara Ilmu Sosial, Humaniora, dan Seni, 3(2).
Kaur, S., Singh, P., Tripathi, V., & Kaur, R. (2022). Recent trends in wireless and optical fiber communication. Global Transitions Proceedings, 3(1), 343-348.
Kiminza, M. M. (2016). Factors affecting successful implementation of fiber optic cable projects in Kenya: A case of Nairobi City County. Developing Country Studies, 6(10).
Laksamana, I. (2011). Analisis penjadwalan proyek fiber optik telekomunikasi dengan metode critical chain.
Li, Y., Sun, T., Shou, Y., & Sun, H. (2020). What makes a competent international project manager in emerging and developing countries? Project Management Journal, 51(2), 1–18.
Maqbool, R., Sudong, Y., Manzoor, N., & Rashid, Y. (2017). The impact of emotional intelligence, project managers’ competencies, and transformational leadership on project success: An empirical perspective. Project Management Journal.
Moradi, S., Kähkönen, K., & Aaltonen, K. (2020). Comparison of research and industry views on project managers’ competencies. International Journal of Managing Projects in Business, 13(3).
Napitupulu, L. F. (2025). Pengaruh pengalaman kerja dan pelatihan terhadap kompetensi karyawan pada PT Perkebunan Nusantara IV Regional 1 Medan.
Ngugi, A. K., & Mutuku, M. (2023). Critical success factors and performance of fibre optic infrastructure projects by information and communication technology authority, Kenya. International Journal of Management and Commerce Innovations, 11(1), 371–380.
Putra, E. P., Theivindran, R., Hasnul, H., Lee, H. J., Ker, P. J., Jamaludin, M. Z., ... & Mohd Yusof, F. A. (2023). Technology update on patent and development trend of power over fiber: a critical review and future prospects. Journal of Photonics for Energy, 13(1), 011001-011001. https://doi.org/10.1117/1.JPE.13.011001
Sampaio, S., Wu, Q., Cormican, K., & Varajão, J. (2022). Reach for the sky: Analysis of behavioral competencies linked to project success. International Journal of Managing Projects in Business, 15(1).
Saputra, G. N. (n.d.). Fiber optic.
Sari, M. P., Pratami, D., & Yasa, P. (2025). Perancangan daftar risiko pada proyek cell site FTTH dengan FMEA dan FTA di PT ABC. e Proceeding of Engineering, 12(1).
Setiyadi, M. D. (2024). Analisis keselamatan dan kesehatan kerja (K3) pada pekerjaan pemasangan kabel fiber optik Icon+ dengan menggunakan metode hazard identification, risk assessment, and determining control (HIRADC) dan job safety analysis (JSA) di PT XYZ.
Sugiyono. (2013). Metode penelitian kuantitatif, kualitatif, dan R&D. Alfabeta.
Varajão, J. E., Silva, H., & Bach, M. P. (2019). Key competences of information systems project managers. International Journal of Information Technology Project Management, 10(3).
Veeranna, D. G., Nagabushanam, M., Boraiah, S. S., Muniyappa, R., & Narayanappa, D. S. (2023). Fiber optic communication: evolution, technology, recent developments, and future trends. Modeling and Optimization of Optical Communication Networks, 163-177. https://doi.org/10.1002/9781119839569.ch9
Wahedy, M. N., & Faqiri, A. (2021). Proposed competencies required for construction project managers in Afghanistan. International Journal of Advanced Academic Studies, 3(1), 192–203.
Zhang, F., Zuo, J., & Zillante, G. (2013). Identification and evaluation of the key social competencies for Chinese construction project managers. International Journal of Project Management, 31, 748–759.
Copyright (c) 2026 Journal La Sociale

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.



